Swift BRT Blue Line

Location: Snohomish County, WA
Client: Community Transit

Otak led station design and construction efforts for CT’s first 17-mile BRT line running along SR 99, Evergreen Way, Rucker Avenue and Pacific Avenue within the cities of Everett, Lynnwood, Edmonds, and Shoreline; and unincorporated Snohomish County. Station design products included both a station shelter design/manufacture package and a station site construction and shelter installation package. For the station shelter manufacturing package, Otak provided conceptual level design of the shelters and station amenities and coordination with shelter manufacturer throughout the design, manufacturing, and installation process. The second package included station site construction and shelter installation for 30 station locations, including design of the station platform and installation of the shelter, shelter railing, an iconic marker providing station identity, ticket vending machines, and passenger information signing. Otak provided surveying, civil engineering, landscape architecture, planning, utility coordination, and construction support services and inspection.