North Shore Sewer Transmission System

Location: Camas, WA
Client: City of Camas

Otak is currently providing full scope construction management, inspection, and materials testing for this large-scale sewer and pump station project extending into the north urban growth boundary in Camas. The project includes over 30,000 feet of sanitary and water pipe, three new pump stations, and significant asphalt paving. Additionally, a joint pedestrian and utility bridge is being constructed. Otak has a full-time construction manager and often two or three inspectors onsite, covering the work that spans nearly a five mile distance. Otak’s services include ADA ramp inspections, daily erosion control inspections, pipe and trench inspections, and asphalt paving construction and testing.

Related Disciplines