Blog
October 2016

From September 28 through October 1st, Otak staff members attended the ASCE National Convention held in Portland, Oregon. 

Otak’s Doug Sarkkinen, PE, SE presented his team’s 2015 fast-track design and construction of the Dungeness River Railroad Trestle Replacement project. Designed and constructed in seven months, this project resulted in restoration of the Discovery Trail over the Dungeness River near Sequim, Washington.  Otak was hired in May 2015 and the bridge was re-opened December 2015.  Otak’s team generated 10 design options with the final selection proving to be salmon friendly to the river’s several anadromous fish runs and “river worthy” by virtue of foundations capable of withstanding deep scour forces and seasonal debris buildup.   

The trail and bridge over the Dungeness River is owned by the Jamestown S’Kallam Tribe.  A February 2015 flood damaged the adjoining railroad trestle and bridge and associated foundations.  Fast-track completion by Otak of this project restored use of the Discovery Trail to numerous hikers, bikers, pedestrians, and commuters who count on it as an important multi-modal transportation route.


ABOVE: Doug Sarkkinen, PE, SE, highlights Otak’s Dungeness River Railroad Trestle Replacement project at the ASCE 2016 National Convention

The event  was an excellent backdrop for connecting with partners and staying current with the latest advances in how to prepare our communities for the future. 

ABOVE: Jim Hamann, Otak President and CEO (left), and Brian Burby of Otak (right) meet with representatives from leading universities throughout the West. 

Comments

Nobody's commented on this post yet.


Enter number & letters from the image to the right.