Otak Blog

Proactive partners. Passionate problem-solvers.

Archive for February, 2009

Diamond Creek Bridge Opens for Traffic

Friday, February 13th, 2009

The Diamond Creek Bridge was recently completed in southern Oregon. Spanning a 65-foot deep canyon, this bridge serves logging trucks and through traffic along the Tiller-Trail Highway (Oregon 227). The new bridge is two spans and 260-feet in length with many aesthetic features. Otak prepared the structural and approach roadway engineering, as well as utility coordination and construction management. This project was honored at the 2009 ACEC Oregon Engineering Excellence Awards ceremony.

 

Tempe Engineer Shines

Thursday, February 5th, 2009

From Kevin Rohrbough:
After a couple of months of crashing back into my old college text books and reviewing numerous engineering references, I was ready for the Big Day and the PE Exam. It was an early rise and a late finish, but when it was all said and done I felt great about the test! After 12 grueling weeks of sit and wait, I got my results and my heart skipped a beat! After all the hard work and dedication it’s great to now be a licensed Professional Engineer in the State of Arizona!