Diamond Creek Bridge Opens for Traffic
Friday, February 13th, 2009The Diamond Creek Bridge was recently completed in southern Oregon. Spanning a 65-foot deep canyon, this bridge serves logging trucks and through traffic along the Tiller-Trail Highway (Oregon 227). The new bridge is two spans and 260-feet in length with many aesthetic features. Otak prepared the structural and approach roadway engineering, as well as utility coordination and construction management. This project was honored at the 2009 ACEC Oregon Engineering Excellence Awards ceremony.



